EN ISO 9606-1: how the welder test works and what the certificate covers

ISO 9606-1 is the standard that tests the welder rather than the weld: you weld one test piece, it is examined, and the certificate lists the processes, thicknesses and positions you may weld afterwards. It replaced EN 287-1 and is valid for three years. Below: the test day, the code, and how to choose a piece that covers your work; to check an existing certificate use the ISO 9606-1 range calculator.

Short answer

The certificate is a single string like 135 P FW FM1 S t10 PB ml: process, product form, weld type, filler group, thickness, position. Every field is a limit rather than a description — outside it the certificate no longer applies. It lasts three years, with a signature every six months.

The ISO 9606-1 test, step by step

The day itself is short. Most of what decides the result is settled before you strike an arc, so it is worth knowing the order of events.

  1. Apply to an accredited body. The certificate is issued by an examiner or examining body, not by your employer. Training centres usually work with one, so the application often goes through them.
  2. Fix what you are tested on. Process (111, 135, 136, 141…), plate or pipe, butt or fillet weld, filler group, test piece thickness or diameter, and position. Each of these becomes a field of the code and a limit on what you may weld afterwards — read the next section before you sign the application.
  3. The instruction for the test piece. You weld to a WPS or a pWPS stating the joint preparation, filler, gas and parameter band. If the company already has a qualified WPS for this kind of joint, that one is normally used; otherwise a pWPS is prepared for the test — a draft can be made with the free pWPS generator. A WPS is qualified by a WPQR, which tests the procedure, not you; what one procedure test covers is worked out by the WPQR range calculator (ISO 15614-1).
  4. Marking. Before welding, the examiner marks the test piece, so that what goes to testing is provably the piece you welded, in the position you welded it.
  5. Welding under observation. You weld a plate or a pipe in the position and with the process being qualified. The examiner watches the welding, not just the result. Nothing exotic is asked for: the point is a sound joint under normal conditions, to a written instruction.
  6. Visual inspection first, to the acceptance levels of ISO 5817 — usually level B. Anything the visual inspection rejects ends the matter there, which is why the surface finish of the test piece is worth the extra ten minutes.
  7. Then, depending on material and thickness, radiography (RT) or ultrasonics (UT), or bend tests or a fracture test instead. A macro-section may be taken.
  8. The certificate. If everything passes, the examining body issues the certificate with the code and the range of qualification. Check it before you file it away: process, thickness, diameter and position must match what you actually welded.

If you are coming to work in Poland from outside the EU: a non-EU certificate is, as a rule, not recognised directly, and the test is sat again at a Polish accredited centre. The route is described under welding qualifications in Poland and welding work in the EU for foreign workers.

Advertisement

Reading the certificate code

A designation looks like this:

EN ISO 9606-1 135 P FW FM1 S t10 PB ml

The code 135 P FW FM1 S t10 PB ml broken into eight fields: process, product, weld type, filler group, filler, thickness, position, weld details
Every field is a limit, not a description: outside any one of them the certificate no longer covers the weld.

Download the diagram: SVG · PNG

  • 135 — the process, here MAG with solid wire.
  • P — plate (T would be tube).
  • FW — fillet weld (BW butt weld).
  • FM1 — the filler material group.
  • S — solid wire.
  • t10 — test piece thickness 10 mm.
  • PB — the position.
  • ml — multi-layer, i.e. more than one run. Welding from one side and without backing are separate fields (ss, nb) in the table below.

Every field limits what you may weld. The one welders most often overlook is the material group: a certificate on group 1 steel says nothing about stainless. The thickness, diameter and position ranges are worked out by the qualification range calculator.

FieldWhat it encodesCommon values
141The process to ISO 4063111 — MMA, 135 — MAG, 136 — flux-cored, 141 — TIG
PProduct formP — plate, T — tube
BWWeld typeBW — butt, FW — fillet
FM1Filler group to EN ISO 9606-1FM1 — unalloyed and fine-grain steels, FM5 — stainless and heat-resisting, FM6 — nickel and nickel alloys
SFiller materialS — solid wire or rod, M — metal-cored wire
t8Test piece thickness, mmt3, t8, t12 — the thickness range is worked out from it
PFPosition to ISO 6947PA, PC, PF, PE, H-L045
ssWelded from one sidebs — from both sides
nbNo backingmb — with backing

Decoding one certificate line

A line as it might stand on the certificate of a pipe welder: ISO 9606-1 135 T BW FM1 S t5.5 D60.3 H-L045 ss nb. Read it left to right; the last column is what each field allows you to weld. Thickness, diameter and positions follow the same rules as the range tables on this page and the ISO 9606-1 range calculator. For the filler group and the weld details the site does not calculate a range: read those off the range column of the certificate itself.

FieldMeaningWhat it covers
ISO 9606-1Standard, part 1: steelsSteels only; aluminium, copper, nickel and titanium are qualified to other parts of ISO 9606
135MAG with solid wire (ISO 4063)Covered: 135 and 138. Not covered: 136, 131, 114
TPipePipe and, with D over 25 mm, plate as well
BWButt weldButt welds; fillet welds only with a supplementary fillet test piece
FM1Filler group: unalloyed and fine-grain steelsFM1; further groups, if any, are listed in the range column of the certificate
SSolid wireRead it with the process: 135 also covers 138, which runs on metal-cored wire (M)
t5.5Wall thickness of the test piece, mm3…11 mm (3 ≤ t < 12: from 3 mm to 2·t)
D60.3Outside diameter of the pipe, mm≥ 30.2 mm (D > 25 mm: from 0.5·D, never below 25 mm)
H-L045Fixed pipe at 45°, welded upwardsButt welds: PA, PC, PE, PF, PH, H-L045. Fillet welds: only with a fillet test piece
ss nbWelded from one side, no backingWith process 13, 14 or 15, a test without backing (nb) also covers welding with material or gas backing (ISO/TC 44/SC 11 interpretation of Table 11, 2015). The rest of the range is stated in the certificate; not calculated here

Dates: the first confirmation is due six months after the test, and the certificate ends three years after it unless renewed. Enter the test date in the calculator and it gives you both.

What the ranges mean in practice

A 10 mm plate test covers 3 to 20 mm. A pipe test at 114.3 mm outside diameter covers 57.2 mm and up.

Three numbers on the certificate settle everything: thickness, diameter and position. Below is what each of them covers.

Thickness

Test piece thickness t, mmQualified range
t < 3from t to 3 mm or to 2·t, whichever is greater
3 ≤ t < 12from 3 mm to 2·t
t ≥ 12from 3 mm upwards

Pipe diameter

Diameter range from a pipe test — worked out by the same rule the calculator uses
Test piece diameter D, mmQualified range
21.321.3…42.6 mm
25.025.0…50.0 mm
33.7≥ 25.0 mm
48.3≥ 25.0 mm
60.3≥ 30.2 mm
88.9≥ 44.5 mm
114.3≥ 57.2 mm
168.3≥ 84.2 mm
219.1≥ 109.6 mm

Position

Passed in positionCovers
PA — flatbutt welds: PA
fillet welds: PA
PB — horizontal-vertical filletbutt welds: —
fillet welds: PA, PB
PC — horizontalbutt welds: PA, PC
fillet welds: PA, PB, PC
PD — overhead filletbutt welds: —
fillet welds: PA, PB, PC, PD, PE
PE — overheadbutt welds: PA, PC, PE
fillet welds: PA, PB, PC, PD, PE
PF — vertical upbutt welds: PA, PF
fillet welds: PA, PB, PF
PG — vertical downbutt welds: PG
fillet welds: PG
PH — fixed pipe, upwardsbutt welds: PA, PE, PF, PH
fillet welds: PA, PB, PC, PD, PE, PF, PH
H-L045 — pipe at 45°, upwardsbutt welds: PA, PC, PE, PF, PH, H-L045
fillet welds: —
J-L045 — pipe at 45°, downwardsbutt welds: PA, PC, PE, PG, PJ, J-L045
fillet welds: —

Choosing the test piece so the certificate covers your work

Work backwards. List the joints you actually weld — thickness, plate or pipe, diameter, positions — and pick the one test piece whose range contains them. The worked examples below use the same rules as the tables above and the calculator.

The three cases below in one table, worked out by the same rules as the range calculator (the pipe D60.3 is decoded field by field above):

Test pieceThicknesses coveredDiameters coveredButt weld positions covered
plate t = 10 mm, PF3…20 mm—PA, PF
plate t = 15 mm, PE≥ 3 mm—PA, PC, PE
pipe D = 21.3 mm, t = 2.8 mm, PC2.8…5.6 mm21.3…42.6 mmPA, PC

Plate, 10 mm, butt weld in PF

10 mm falls in the 3 ≤ t < 12 band, so the range runs from 3 mm to 2·t: 3 to 20 mm. A PF butt covers PA and PF; PB is a fillet position and joins the range only with an additional fillet test piece. That is most of what a structural shop welds: 4 mm brackets and 16 mm flanges are inside the range; an overhead joint (PE) is not.

A 10 mm plate test piece welded in PF, with the qualified thickness range on a scale and which welding positions the certificate covers
One 10 mm test piece in PF: thicknesses from 3 to 20 mm, butt welds in PA and PF (PB with a fillet test) — most structural shop work, but no overhead welds.

Download the diagram: SVG · PNG

Thicker and thinner test pieces

A 15 mm test piece is in the t ≥ 12 band: from 3 mm upwards, with no upper limit. The standard requires such a piece to be welded in at least three layers — a longer, harder test, but the certificate then reaches heavy sections as well. At the other end, a 2 mm test piece covers t to 3 mm or 2·t, whichever is greater, i.e. 2 to 4 mm — a sheet-metal certificate that does not stretch to structural plate. If your work runs from thin brackets to 20 mm plate, the 10 mm piece is the one that fits.

Pipe diameter

Above 25 mm the range starts at 0.5·D, never below 25 mm, with no upper limit: a 60.3 mm test covers 30.2 mm and up. Small bore follows a different rule — at 25 mm and below the range is D to 2·D, so a 21.3 mm test covers only 21.3 to 42.6 mm. A welder who does both instrument lines and 60.3 mm process pipe has to look closely: the 60.3 mm test does not go down to 21.3 mm.

Positions: one pipe test for almost everything

H-L045 — pipe fixed at 45°, welded upwards — covers butt welds in PA, PC, PE and PF, plus PH and H-L045 itself: every butt position except downhill. What it does not cover is PG or PJ, which only a downhill test covers. PB and PD are fillet positions and need a fillet test piece. On plate, a PE butt covers PA, PC and PE and a PC butt covers PA and PC; a PE fillet covers PA, PB, PC, PD and PE.

Plate or pipe?

This is the one rule that lives outside the tables above. Under ISO 9606-1 a pipe test over 25 mm diameter covers plate as well. A plate test covers pipe only from 75 mm diameter when the pipe is rotated (and then in PA, PB, PC and PD), and fixed pipe from 500 mm. If any of your work is pipe under 500 mm welded in place, the test has to be on pipe.

The rule of thumb: test in the hardest position you really weld in production, on the product form that covers the rest. Easier positions follow; the reverse never happens. Check your choice in the ISO 9606-1 range calculator before you book the test.

EN 287-1 and ISO 9606-1

EN 287-1 is the former European standard for qualification testing of steel welders; EN ISO 9606-1 replaced it. The idea did not change — a test piece, a range derived from it, a signature every six months — but the code is written differently. The field people misread is the fourth: on an ISO 9606-1 certificate it is the filler group (FM1–FM6), while older EN 287-1 certificates carried the steel group there. New tests are taken to ISO 9606-1. If you still hold an EN 287-1 certificate, ask the customer or the inspector whether it is accepted before you rely on it.

ISO 9606-1 and the other parts of ISO 9606

ISO 9606-1 is part 1 of a series: Qualification testing of welders — Fusion welding — Part 1: Steels. The current text is ISO 9606-1:2012; in Europe it is published as EN ISO 9606-1:2017, which adds the later corrections, and nationally as DIN, PN, BS or NF EN ISO 9606-1 — same rules, different publisher. A revision of the series (ISO/DIS 9606) is in preparation. The other metals have their own parts:

PartMaterials
ISO 9606-1Steels (carbon, low-alloy, stainless)
ISO 9606-2Aluminium and aluminium alloys
ISO 9606-3Copper and copper alloys
ISO 9606-4Nickel and nickel alloys
ISO 9606-5Titanium, zirconium and their alloys

Fully mechanised and automatic welding is outside ISO 9606: operators of such equipment are qualified to ISO 14732.

Why welders fail the test

Failures cluster at each stage of testing, and most of them can be seen before the piece leaves your hands.

At visual inspection

Undercut, a groove not completely filled, a cap standing too proud, an uneven root. Level B leaves little room; only undercut and excess metal (cap height, convexity, excess penetration) are judged at level C: undercut is limited to 0.1·t and never more than 0.5 mm, so on 10 mm plate 0.5 mm is the ceiling, and incomplete filling of the groove is not permitted at all. The limits for your thickness are in the ISO 5817 calculator; what each level means is on the ISO 5817 page.

On bend and fracture tests

Lack of fusion at the root or between runs. From the surface it may be invisible, but a bend test opens it up along the fusion line. Lack of fusion (401) is not permitted at any quality level. It comes from too little heat at the side walls: travel too fast, the wrong torch or electrode angle, a run laid on top of the previous one instead of into the corner.

On the radiograph

Porosity, slag, lack of fusion between runs. At level B a single pore may be up to 0.2·t and no more than 3 mm. Pores usually come from poor gas cover — draughts, a spatter-clogged nozzle — or from a dirty or damp joint.

Before the arc

Preparation and cleaning: a bevel ground unevenly, a root gap that changes along the joint, mill scale or rust left on the faces, slag not removed between runs. None of this is the examiner's job to fix, and all of it shows up in the tests.

Keeping it alive

Every six months, a signature from the employer confirming you have worked within the range. Every three years, either a re-test or — where the route is available — an extension based on documented production tests. Keep copies of the certificate and of every confirmation: certificates are regularly lost by the company that holds them, and reissuing one from the certifying body is easier than sitting the test again.

Three routes under clause 9.3

After the test, ISO 9606-1 gives three ways of keeping the certificate valid (clause 9.3). The six-monthly confirmation applies on every one of them, and which route is open to you is decided by the body that issued the certificate.

RouteWhat it takesHow long it then runs
9.3 a — re-testA new test piece, welded and examined like the firstA new certificate, three years
9.3 b — production weldsTwo welds from the last six months, tested with acceptable results and kept on recordTwo more years
9.3 c — quality systemThe same manufacturer, an ISO 3834-2 or -3 quality system, documented weld qualityNo end date while these conditions hold

A missed six-monthly confirmation closes all three routes: the certificate ends on that date, and the way back is a new test.

Who signs

The employer — in practice the welding coordinator or the person responsible for welding. The signature says one thing: in the last six months you have welded within the range of this certificate. It is not a formality; without it the welds made in the meantime were, on paper, made by an unqualified welder.

Changing employer

The certificate is yours and goes with you. The signature does not: a new employer can only confirm work done for them. Before you leave, ask the old employer to sign for the period you worked there; give the new one a copy on your first day, and make sure the next signature comes within six months of the last one.

A break of more than six months

If you have not welded with the process for more than six months — illness, a different job, a long stay abroad — there is nothing to confirm, and the certificate lapses whatever the three-year date says. A new test is then the normal way back.

What the certificate does not do is authorise the joint on its own. The procedure has to be qualified too, and that is the welding procedure specification (WPS). Both documents, every time.

A 36-month timeline with the employer’s signature every 6 months; after 3 years, renewal by retest or production records; below, a break of over six months ends validity, and on changing employer the certificate goes with the welder but the signature does not
The certificate lasts three years, but only with a signature every six months.

Download the diagram: SVG · PNG

Standards and references

Edition, clause or table, and what this page takes from each. The numbers were checked against the clause lists that the standards publishers make public; the full texts are sold by standards bodies.

  • EN ISO 9606-1:2017 (ISO 9606-1:2012), clauses 5.2–5.9 — essential variables and ranges: process, product type, weld type, filler, dimensions, positions
  • EN ISO 9606-1:2017 (ISO 9606-1:2012), clauses 9.2, 9.3 — six-monthly confirmation and the routes to prolongation
  • EN ISO 9606-1:2017 (ISO 9606-1:2012), clause 11 — how the designation on the certificate is built

Frequently asked questions

How long is the certificate valid?

Three years, but only if the employer signs every six months that you have been welding within its range. A missed signature ends it early, and that — not the three-year date — is the usual reason a certificate turns out to be invalid on site.

Is a certificate from one EU country valid in another?

Yes. EN ISO 9606-1 is a European standard, and a certificate issued by an accredited body is recognised across the Union. What does not travel is the manufacturer's procedure qualification and factory production control — those stay with the company.

Which position should I take the test in?

The hardest one you can pass. Positions cover downwards, so a PF butt covers PA (a PF fillet adds PB) while PA covers only itself. On pipe, H-L045 is the single butt test with the widest coverage: every butt position except downhill. Paying twice to sit an easy test and then a hard one is the expensive route.

What thickness does a 10 mm test piece cover?

3 to 20 mm. For test pieces from 3 mm up to but not including 12 mm the range runs from 3 mm to twice the test thickness. Position and product form are separate limits: a 10 mm plate butt weld in PF covers butt welds in PA and PF on plate, and pipe only from 75 mm rotated or 500 mm fixed.

What is the difference between ISO 9606-1 and EN 287-1?

ISO 9606-1 is the current standard; EN 287-1 is the one it replaced, and new tests are taken to ISO 9606-1 only. The difference welders trip over is the fourth field of the code: filler group (FM1–FM6) on the new certificate, steel group on the old one. A combined ISO 9606, with parts 1–5 in one document, is still a draft (ISO/DIS 9606, prEN ISO 9606:2026; as of November 2026).

Can the certificate be extended without a new test?

Sometimes. ISO 9606-1 gives three routes (clause 9.3): a re-test every three years, an extension every two years based on two production welds tested in the last six months, or no end date at a manufacturer with an ISO 3834-2 or -3 quality system. Which one applies to you is decided by the body that issued the certificate. Without an unbroken chain of six-monthly confirmations none of them is open.

Author: , welder and metal fabricator Updated: